Return
Print
Email
FLEXTIME IMPACT W/CUT
005tpc-copy.png

FLEXTIME IMPACT W/CUT by Watson Gloves

$
37
73
/ 1
  • Part Number: 005TPC-L
  • UPC:
  • Availability:
Quantity:
Add To Cart
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (5)
Product Overview
Info & Guides
FLEXTIME CUTSHIELD A5 WASTENOT SPANDEX PERFORMANCE - L
Long Description
WasteNot™ spandex back made from 96% recycled post consumer PET bottles, Dryhide™ water-resistant full-grain goatskin leather palm, Cutshield™ ANSI A5 full-sock liner, heavy duty rubber on back of hand and fingertips, conductive fingertips can be used on all touchscreen devices snug-fitting elastic wrist with Velcro® closure. Size S–XXL. *Two- 500mL recycled plastic bottle is used to make one pair of gloves
Specifications
Details
Category:
Safety
Subcategory:
Gloves and Hand Protection
Subtype:
Cut-Resistant Gloves
Applications:
General Construction, Light/Medium Industrial, Landscaping
Back Material:
Spandex with TPR
Brand:
WORK ARMOUR
Case Height:
15.7
Case Length:
25.5
Case QTY:
72
Case UOM:
BOX
Case Weight:
51.3
Case Width:
14.5
Category:
High Performance Cut Resistant / Sustainable
Category w/ Gloves:
Cut Resistant Gloves
Closure Type:
Velcro®
Colour:
Black/Tan
Combined Dimensions:
9x4x1
Combined Dimensions.1:
25.5x14.5x15.7
COO:
CHINA
French Short Desc:
FLEXTIME IMPACT AVEC CUTSHIELD-GRAND
HS number:
4203.29.3020
Inner GTIN:
10065537865208
Inner Height:
6
Inner Length:
9
Inner QTY:
6
Inner UOM:
PACK
Inner Weight:
2.7
Inner Width:
4
Lining:
Cutshield™
Outer GTIN:
50065537865206
Palm Material:
Goatskin
Selling Height:
1
Selling Length:
9
Selling QTY per UOM:
1
Selling UOM:
PAIR
Selling Weight:
0.45
Selling Width:
4
Short Description No Size:
FLEXTIME IMPACT W/CUTSHIELD
Size:
L
Standards:
EN 388 3X33FP, ANSI/ISEA 105: ABRASION 4, ANSI/ISEA 105: A5 CUT, ANSI/ISEA 105: PUNCTURE 4, ANSI/ISEA 138: IMPACT 3
Style:
005TPC
Thumb Type:
Wing
UNSPSC:
46181536
UPC:
065537865201
Watson Category:
NEW
Manufactured By:
Watson Gloves
Other Details
Cutshield™ Para-aramid/steel/polyester liner
Dryhide™ water resistant full-grain goatskin leather palm
Heavy duty rubber on back of hand, fingers and knuckle bar
Hooded fingertips and thumb
To:
From:
Subject:

Hallmark Sales Corporation

We Source and recommend products. Search for the lowest cost alternative. Complete inspection of every product at our own warehouse. Packing and marking according to all regulations. Consolidation of orders. Dedicated inventory solutions. Special low-cost cargo routings. Complete documentation preparation. Supply chain solutions. Financing, both short term and medium term.

Contact Us

10021 Cossey Road
Houston, Texas 77070, USA

Store Hours

M-F: 8am – 5pm
Sat: Closed
Sun: Closed
Copyright 2025 Hallmark Sales Corporation. ALL Rights Reserved.