Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.
Specifications
Details
Category:
Safety
Subcategory:
Gloves and Hand Protection
Subtype:
Impact Resistant and Anti-Vibration Gloves
Applications:
Automotive, Construction, Equestrian, GARDENing & Landscaping, General Purpose
Back Material:
Spandex with TPR
Brand:
WORK ARMOUR
Case Height:
13.4
Case Length:
25.6
Case QTY:
72
Case UOM:
BOX
Case Weight:
32.4
Case Width:
13.4
Category:
Impact
Category w/ Gloves:
Impact Gloves
Closure Type:
Velcro®
Colour:
Black/Tan
Combined Dimensions:
25.6x13.4x13.4
9x4x1
COO:
CHINA
HS number:
4203.29.3010
Inner Height:
6
Inner Length:
9
Inner QTY:
6
Inner UOM:
PACK
Inner Weight:
2.7
Inner Width:
4
Palm Material:
Goatskin
Selling Height:
1
Selling Length:
9
Selling QTY per UOM:
1
Selling UOM:
PAIR
Selling Weight:
0.45
Selling Width:
4
Size:
L
Style:
005TPR
Thumb Type:
Wing
UNSPSC:
46181504
UPC:
065537865157
Watson Category:
All Season
Manufactured By:
Watson Gloves
Other Details
Dryhide™ water resistant full-grain goatskin leather palm
Heavy duty rubber on back of hand, fingers and knucle bar
Hooded fingertips and thumb
Snug-fitting elastic wrist
Spandex stretch back
To:
From:
Subject:
Copyright 2025 Hallmark Sales Corporation. ALL Rights Reserved.