Part Number: 005TPC-M / Vendor ID Number: 1178051 / Custom:
FLEXTIME IMPACT W/CUT
005TPC-Flextime.png

FLEXTIME IMPACT W/CUT
by Watson Gloves

32
13
Pack Of: 1
Contact for Availability
Qty
Product Overview
FLEXTIME IMPACT W/CUTSHIELD - MEDIUM
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. WasteNot™ Spandex stretch back made from 96% recycled PET bottles, Cutsheild™ Para-aramid/steel/polyester liner with ANSI cut level A5 resistance for superior protection. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris
Product Availability
Additional Information
Cutshield™ Para-aramid/steel/polyester liner
Dryhide™ water resistant full-grain goatskin leather palm
Heavy duty rubber on back of hand, fingers and knuckle bar
Hooded fingertips and thumb
Spandex stretch back
Info & Guides
Technical Details
Details
Category:
Safety
Subcategory:
Gloves and Hand Protection
Subtype:
Cut-Resistant Gloves
Applications:
General Construction, Light/Medium Industrial, Landscaping
Back Material:
Spandex with TPR
Brand:
Work Armour
Case Height:
15.7
Case Length:
25.6
Case QTY:
72
Case UOM:
BOX
Case Weight:
32.4
Case Width:
14.6
Category:
Cut Resistant
Category w/ Gloves:
Cut Resistant Gloves
Closure Type:
Velcro®
Colour:
Black/Tan
Combined Dimensions:
25.6x14.6x15.7
9x4x1
COO:
CHINA
HS number:
4203.29.3010
Inner Height:
6
Inner Length:
9
Inner QTY:
6
Inner UOM:
PACK
Inner Weight:
2.7
Inner Width:
4
Lining:
Cutshield™
Palm Material:
Goatskin
Selling Height:
1
Selling Length:
9
Selling QTY per UOM:
1
Selling UOM:
PAIR
Selling Weight:
0.45
Selling Width:
4
Size:
M
Standards:
ANSI A5 CUT
Style:
005TPC
Thumb Type:
Wing
UNSPSC:
46181536
UPC:
065537865195
Watson Category:
NEW
Manufactured By:
Watson Gloves
To: From: Subject:

Hallmark Sales Corporation

Hallmark Sales Corporation is a company that since 1979 has been at the service of multinational corporations. We specialize in purchasing and supply chain solutions specially designed to solve the problems associated with international transactions. If your company needs a product, we can source it, purchase it at a competitive price, inspect it, pack it according to all regulations, prepare all documentations, ship it, and even finance it.

Contact Us

Hallmark Sales Corporation
10021 Cossey Road
Houston, Texas 77070

Office Hours

M-F: 8am – 5pm
Sat-Sun: Closed
IBC Logo
Try our service without cost, all we need is your requisition!
IBC Logo E-Award Logo
Copyright 2024 Hallmark Sales Corporation. ALL Rights Reserved. ADA Compliant